Projects
New Air Source installation in St Kew, carried out by Nick our in house Heating Engineer.
An existing customer had contacted us regarding the installation of an Air Source underfloor heating system in the holiday lodge that he is building.
Hidden House was a project where MQS carried out every aspect of the build, giving the homeowner complete peace of mind that nothing would be missed.
From the very start we managed the drainage and foundations, coordinated all health and safety requirements, and oversaw every trade on site. With our own fleet of plant machinery, we handled the excavation and structural work for the swimming pool, then tiled it out to a flawless finish. The sauna and plant room were also fully built and tiled by our team.
The summer house project was all about creating a beautiful, functional space that complemented the client’s main home.
They wanted a building that used the same stonework and finishes inside and out, tying it seamlessly into the property while offering a new area to enjoy the views.
We designed and built the summer house with large bi-fold doors that flood the space with light and open directly onto a new decking area. The decking was fitted with lighting to give the space atmosphere in the evenings, making it a place for family and friends to enjoy throughout the year. At the same time, we built in a large, hidden shed area for storage, blending practicality into the design without taking away from the feel of the building.
This large property needed a heating and hot water system that could cope with five en-suites, two main bathrooms, and additional leisure spaces, all while being efficient and reliable. MQS was asked to design and install a complete system that would keep the whole home comfortable and future-ready.